RING,WEAR,DWG.638-8858,FOR PP-1752A

Material 4300024344 · RING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300024344
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
108 d · P80 161 d
Unit price
Rp 3.5M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~108 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 161 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 6.9M · order by 01 Oct 2026
Expected arrival ≈ 108 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 25 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 3.5M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 295 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 899.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1752A
SLOP OIL PUMP
A141.90

Lead time and procurement

Lead time 108 ± 57 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR06
Regular replenishment
1Rp 3.5M25 Nov 2026
open
71 d
28 Jun 2026PR06
Regular replenishment
1Rp 3.3M21 Jan 2027
open
207 d
16 Mar 2026PR06
Regular replenishment
2Rp 3.5M15 Jun 202691 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_PP-1752A[MSI-B-26-XYL-202] Permanent repair
30 Jan 2026LowPX_PP-1752AReplace bearing PP-1752A
19 Nov 2025LowPX_PP-1752A[MSI-B-25-DGU-132] Permanent repair
28 Jul 2025LowPX_PP-1752AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
10 Dec 20251201000007599Corrective