BEARING,JOURNAL,DWG.337-3087,FOR KC-150A

Material 4300024696 · BEARING · Plant 1000

SMonitorNo stock needed
Material
4300024696
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK NUSANTARA PT
Lead time
83 d · P80 127 d
Unit price
Rp 331.5M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~83 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 11%
Unit price
Rp 331.5M
PO history
ML early warning: 0% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 83 ± 40 days (PO history + category, 2 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
23 Mar 2026PR06
Regular replenishment
2Rp 317.6M13 Aug 2026143 d
07 Sept 2025PR06
Regular replenishment
2Rp 331.5M23 Dec 2025107 d
08 Jun 2025PR05
Project / turnaround
1Rp 333.0M17 Sept 2026466 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Nov 2025MediumPX_KC-150AKC-150A bearing temp high
21 May 2025LowPX_KC-150APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000003295Corrective