NOZZLE,SAFETY VALVE,DWG.663-6217,FOR PRV
Material 4300024770 · NOZZLE · Plant 1000
CSafety-criticalLong-leadReorderNormalSlow-moving
- Material
- 4300024770
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 124 d · P80 138 d
- Unit price
- Rp 8.3M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~124 days; expected demand during lead time 0.2.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 5.On hand 1 + on order 1 is at or below the reorder point: order 4 now.
- 6.Long lead time: 80% of deliveries took up to 138 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
4 EA
Rp 33.4M · order by 01 Oct 2026
Expected arrival ≈ 124 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 03 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.8%
stockout risk now 6%
Unit price
Rp 8.3M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 284 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 285.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PRV-358 SAFETY VALVE PP-1337 | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 124 ± 35 days (PO history, 3 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Jun 2026 | PR05 Project / turnaround | 1 | Rp 8.4M | 03 Oct 2026 open | 121 d |
| 20 Jan 2026 | PR06 Regular replenishment | 2 | Rp 8.3M | 12 May 2026 | 112 d |
| 04 Sept 2025 | PR06 Regular replenishment | 1 | Rp 8.3M | 01 Feb 2026 | 150 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Dec 2025 | 1 | 201000009100 | Corrective |
| 21 Dec 2025 | 2 | 201000009100 | Corrective |