SLEEVE,SHAFT,DWG.691-6742,FOR PP-987A
Material 4300025029 · SLEEVE · Plant 1000
ALong-leadMonitorInsurance gap
- Material
- 4300025029
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- LANGIT ELEKTRIK ABADI PT
- Lead time
- 137 d · P80 167 d
- Unit price
- Rp 4.7M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~137 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Long lead time: 80% of deliveries took up to 167 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.7M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 61.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-987A INHIBITOR PUMP | A | 1 | 2 | 1.05 |
Lead time and procurement
Lead time 137 ± 51 days (PO history, 3 PO lines) · on-time 46%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Mar 2026 | PR06 Regular replenishment | 1 | Rp 4.5M | 12 Jun 2026 | 84 d |
| 04 Jan 2026 | PR04 Regular (other) | 1 | Rp 4.7M | 28 Jun 2026 | 175 d |
| 01 Jun 2025 | PR03 Regular replenishment | 1 | Rp 4.8M | 03 Nov 2025 | 155 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Aug 2025 | Medium | PX_PP-987A | Replace lamp as per PM finding |
| 09 Jul 2025 | Medium | PX_PP-987A | PP-987A abnormal noise |
Recent goods issues
Never issued in the 17-month history.