SLEEVE,SHAFT,DWG.691-6742,FOR PP-987A

Material 4300025029 · SLEEVE · Plant 1000

ALong-leadMonitorInsurance gap
Material
4300025029
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
LANGIT ELEKTRIK ABADI PT
Lead time
137 d · P80 167 d
Unit price
Rp 4.7M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~137 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Long lead time: 80% of deliveries took up to 167 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 4.7M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 61.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-987A
INHIBITOR PUMP
A121.05

Lead time and procurement

Lead time 137 ± 51 days (PO history, 3 PO lines) · on-time 46%

PR dateTypeQtyUnit priceDeliveryLead time
20 Mar 2026PR06
Regular replenishment
1Rp 4.5M12 Jun 202684 d
04 Jan 2026PR04
Regular (other)
1Rp 4.7M28 Jun 2026175 d
01 Jun 2025PR03
Regular replenishment
1Rp 4.8M03 Nov 2025155 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Aug 2025MediumPX_PP-987AReplace lamp as per PM finding
09 Jul 2025MediumPX_PP-987APP-987A abnormal noise

Recent goods issues

Never issued in the 17-month history.