Sparely
DU

DISC,SAFETY VALVE,DWG.392-3943,FOR PRV-3

Material 4300025486 · DISC · Plant 1000

SSafety-criticalLong-leadReduceSlow-moving
Material
4300025486
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
93 d · P80 171 d
Unit price
Rp 32.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~93 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 7 exceeds the level to keep (2) by 5.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 32.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 327 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 154.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-346
SAFETY VALVE PP-1389A
S200.04

Lead time and procurement

Lead time 93 ± 64 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
03 Jul 2026PR06
Regular replenishment
1Rp 33.7M20 Sept 202679 d
24 Mar 2026PR06
Regular replenishment
1Rp 31.2M22 Jul 2026120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
08 Nov 20251201000014511Corrective