TRIM SET,CONTROL VALVE,DWG.327-5029,FOR

Material 4300025790 · TRIM SET · Plant 1000

CReduceSlow-moving
Material
4300025790
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
154 d · P80 236 d
Unit price
Rp 100.9M

Recommendation

  • 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~154 days; expected demand during lead time 0.2.
  • 3.A 83.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 42 exceeds the level to keep (1) by 41.
Single source
On hand / on order
42 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
83.2%
stockout risk now 0%
Unit price
Rp 100.9M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1232B
BY PASS DUCT
C120.94

Lead time and procurement

Lead time 154 ± 83 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
10 Jul 2025PR03
Regular replenishment
2Rp 100.9M24 Nov 2025137 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Dec 2025MediumPX_PCV-1232BPCV-1232B; small leak at packing
18 Jul 2025HighPX_PCV-1232BPCV-1232B; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Dec 20251201000016654Corrective