TRIM SET,CONTROL VALVE,DWG.327-5029,FOR
Material 4300025790 · TRIM SET · Plant 1000
CReduceSlow-moving
- Material
- 4300025790
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 154 d · P80 236 d
- Unit price
- Rp 100.9M
Recommendation
- 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~154 days; expected demand during lead time 0.2.
- 3.A 83.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 42 exceeds the level to keep (1) by 41.
Single source
On hand / on order
42 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
83.2%
stockout risk now 0%
Unit price
Rp 100.9M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 13.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1232B BY PASS DUCT | C | 1 | 2 | 0.94 |
Lead time and procurement
Lead time 154 ± 83 days (PO history + category, 1 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Jul 2025 | PR03 Regular replenishment | 2 | Rp 100.9M | 24 Nov 2025 | 137 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Dec 2025 | Medium | PX_PCV-1232B | PCV-1232B; small leak at packing |
| 18 Jul 2025 | High | PX_PCV-1232B | PCV-1232B; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Dec 2025 | 1 | 201000016654 | Corrective |