DISC,SAFETY VALVE,DWG.810-9493,FOR PRV-2
Material 4300026076 · DISC · Plant 1000
SSafety-criticalLong-leadReduceSlow-moving
- Material
- 4300026076
- Category
- DISC
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- SURYA ENERGI JAYA PT
- Lead time
- 159 d · P80 171 d
- Unit price
- Rp 19.7M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~159 days; expected demand during lead time 0.1.
- 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Stock 4 exceeds the level to keep (2) by 2.
- 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
4 / 5
next delivery 16 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 19.7M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 193.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-205A SAFETY VALVE VD-719 | S | 1 | 1 | 0.04 |
Lead time and procurement
Lead time 159 ± 64 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Sept 2026 | PR03 Regular replenishment | 2 | Rp 20.7M | 05 May 2027 open | 246 d |
| 04 Feb 2026 | PR01 Import / long-lead | 1 | Rp 19.7M | 16 Nov 2026 open | 285 d |
| 25 Jan 2026 | PR03 Regular replenishment | 2 | Rp 19.4M | 22 Jan 2028 open | 727 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 May 2025 | Medium | PX_PRV-205A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jan 2026 | 1 | 201000012817 | Corrective |