BEARING,THRUST PAD,DWG.336-2874,FOR KC-2

Material 4300026284 · BEARING · Plant 1000

SMaintainNo stock needed
Material
4300026284
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI REFRAKTORI PRATAMA PT
Lead time
55 d · P80 127 d
Unit price
Rp 102.9M

Recommendation

  • 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen POLead time estimated
On hand / on order
0 / 1
next delivery 10 Apr 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 102.9M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 171 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 938,372/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-236B
DILUTION STEAM FAN
S110.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
26 Feb 2026PR05
Project / turnaround
1Rp 102.9M10 Apr 2027
open
408 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 May 2025MediumPX_KC-236BPSM25/Install scaffolding at KC-236B

Recent goods issues

Posting dateQtyOrderOrder type
13 Apr 20261201000013543Corrective