IMPELLER,DWG.607-3719,FOR PP-1194B
Material 4300026630 · IMPELLER · Plant 1000
ALong-leadReduceSlow-moving
- Material
- 4300026630
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- LANGIT ELEKTRIK ABADI PT
- Lead time
- 170 d · P80 276 d
- Unit price
- Rp 66.9M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~170 days; expected demand during lead time 0.1.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 6 exceeds the level to keep (2) by 4.
- 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
6 / 1
next delivery 10 Nov 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 66.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 556.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1194B RICH AMINE PUMP | A | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 170 ± 88 days (PO history + category, 2 PO lines) · on-time 46%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jun 2026 | PR03 Regular replenishment | 1 | Rp 65.9M | 10 Nov 2026 open | 139 d |
| 08 Jan 2026 | PR03 Regular replenishment | 1 | Rp 67.9M | 17 Jun 2026 | 160 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jan 2026 | 1 | 201000004969 | Corrective |