Material 4300026630 · IMPELLER · Plant 1000

ALong-leadReduceSlow-moving
Material
4300026630
Category
IMPELLER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
LANGIT ELEKTRIK ABADI PT
Lead time
170 d · P80 276 d
Unit price
Rp 66.9M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~170 days; expected demand during lead time 0.1.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 6 exceeds the level to keep (2) by 4.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
6 / 1
next delivery 10 Nov 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 66.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 266 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 556.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1194B
RICH AMINE PUMP
A100.19

Lead time and procurement

Lead time 170 ± 88 days (PO history + category, 2 PO lines) · on-time 46%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jun 2026PR03
Regular replenishment
1Rp 65.9M10 Nov 2026
open
139 d
08 Jan 2026PR03
Regular replenishment
1Rp 67.9M17 Jun 2026160 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
08 Jan 20261201000004969Corrective