BEARING,THRUST PAD,DWG.483-5259,FOR KC-5

Material 4300026675 · BEARING · Plant 1000

SReduceSlow-moving
Material
4300026675
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
NIPPON ROTARY PARTS CO LTD
Lead time
130 d · P80 127 d
Unit price
Rp 219.3M

Recommendation

  • 1.Forecast 0.8 SET/year: 0.0 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~130 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 20 exceeds the level to keep (0) by 20.
Single source
On hand / on order
20 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 219.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 86,226/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-505D
METHANE COMPRESSOR
S111.00

Lead time and procurement

Lead time 130 ± 40 days (PO history + category, 2 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
18 Jan 2026PR03
Regular replenishment
2Rp 216.2M24 Sept 2026249 d
09 Nov 2025PR03
Regular replenishment
2Rp 222.3M02 Jul 2026235 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
07 Jul 2027PX_KC-505DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Jun 2025HighPX_KC-505DRepair insulation KC-505D

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20252203000033054Turnaround