COUPLING,DWG.655-8985,FOR KC-505D
Material 4300026809 · COUPLING · Plant 1000
SReducePotentially obsolete
- Material
- 4300026809
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- GEMILANG MANDIRI JAYA PT
- Lead time
- 102 d · P80 139 d
- Unit price
- Rp 2.2M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~102 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 5 exceeds the level to keep (0) by 5.
Convert to Non StockSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 2.2M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 108,624/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-505D METHANE COMPRESSOR | S | 2 | 1 | 1.00 |
Lead time and procurement
Lead time 102 ± 54 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Apr 2026 | PR05 Project / turnaround | 2 | Rp 2.2M | 23 Sept 2026 | 149 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Jun 2025 | High | PX_KC-505D | Repair insulation KC-505D |
Recent goods issues
Never issued in the 17-month history.