Sparely
DU

TRIM SET,CONTROL VALVE,DWG.980-2476,FOR

Material 4300027547 · TRIM SET · Plant 1000

SReducePotentially obsolete
Material
4300027547
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
187 d · P80 236 d
Unit price
Rp 169.1M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~187 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 9 exceeds the level to keep (0) by 9.
Convert to Non StockSingle sourceOpen PO
On hand / on order
9 / 3
next delivery 04 Dec 2026
Today Min / Max
4 / 11
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 169.1M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 15,305/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-832
CONTROL VALVE
S100.11

Lead time and procurement

Lead time 187 ± 83 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jun 2026PR03
Regular replenishment
1Rp 168.0M26 Dec 2026
open
183 d
04 Mar 2026PR03
Regular replenishment
2Rp 170.2M04 Dec 2026
open
275 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.