SLEEVE,SHAFT,DWG.333-7246,FOR PP-1872A

Material 4300027827 · SLEEVE · Plant 1000

SMaintainNo stock needed
Material
4300027827
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~135 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 3%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 255,686/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~67 days.

Installed on 1 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1872A
QUENCH WATER PUMP
S341.90

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Aug 2026MediumPX_PP-1872AOil leak at PP-1872A bearing housing
29 Apr 2026MediumPX_PP-1872APP-1872A discharge pressure low
17 Sept 2025LowPX_PP-1872AReplace lamp as per PM finding
14 Jun 2025LowPX_PP-1872AOil leak at PP-1872A bearing housing

Recent goods issues

Never issued in the 17-month history.