SEAT RING,VALVE,DWG.491-9077,FOR FCV-408
Material 4300028184 · SEAT RING · Plant 1000
BReduceNon-moving
- Material
- 4300028184
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~110 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 23 exceeds the level to keep (1) by 22.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
23 / 0
no open PO
Today Min / Max
4 / 11
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-408 QUENCH OIL FLOW CONTROL | B | 1 | 1 | 0.54 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2025 | Medium | PX_FCV-408 | Install cover plate for MCP cracking |
Recent goods issues
Never issued in the 17-month history.