TRIM SET,CONTROL VALVE,DWG.137-9702,FOR
Material 4300028421 · TRIM SET · Plant 1000
ALong-leadReduceExcess
- Material
- 4300028421
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- SAMUDRA MESINDO ABADI PT
- Lead time
- 237 d · P80 328 d
- Unit price
- Rp 134.8M
Recommendation
- 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~237 days; expected demand during lead time 0.9.
- 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.Stock 13 exceeds the level to keep (4) by 9.
- 5.Long lead time: 80% of deliveries took up to 328 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadLast turnaround used 1Single sourceOpen PO
On hand / on order
13 / 2
next delivery 13 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
98.7%
stockout risk now 0%
Unit price
Rp 134.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1032 LEVEL CONTROL VALVE | A | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 237 ± 52 days (PO history, 3 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 May 2026 | PR03 Regular replenishment | 1 | Rp 126.4M | 25 Feb 2027 open | 296 d |
| 09 Jan 2026 | PR06 Regular replenishment | 1 | Rp 134.8M | 13 Dec 2026 open | 338 d |
| 07 Aug 2025 | PR06 Regular replenishment | 2 | Rp 135.4M | 15 Jun 2026 | 312 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Aug 2026 | 1 | 204000013772 | Preventive |
| 09 Aug 2026 | 1 | 204000013772 | Preventive |
| 14 Dec 2025 | 1 | 203000027801 | Turnaround |