POSITIONER,VALVE,DWG.751-4143,FOR TCV-13

Material 4300028753 · POSITIONER · Plant 1000

CMaintainHealthy
Material
4300028753
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
88 d · P80 166 d
Unit price
Rp 42.8M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~88 days; expected demand during lead time 0.2.
  • 3.A 78.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single sourceOpen PO
On hand / on order
1 / 1
next delivery 11 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
78.0%
stockout risk now 0%
Unit price
Rp 42.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 88 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1369
PP-645C TEMP CONTROL
C152.26

Lead time and procurement

Lead time 88 ± 64 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR06
Regular replenishment
1Rp 42.8M11 Nov 2026
open
65 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Jul 2026MediumPX_TCV-1369Install cover plate for MCP cracking
03 Jul 2026LowPX_TCV-1369Replace lamp as per PM finding
07 Sept 2025MediumPX_TCV-1369TCV-1369 stuck
06 Sept 2025LowPX_TCV-1369[MSI-B-25-ERJ-296/M] Replace line
02 Jun 2025MediumPX_TCV-1369Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
05 Jul 20261201000025376Corrective