SLEEVE,SHAFT,DWG.796-2907,FOR PP-1320D
Material 4300030789 · SLEEVE · Plant 1000
BReorderNormalSlow-moving
- Material
- 4300030789
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 135 d · P80 210 d
- Unit price
- Rp 8.1M (est.)
Recommendation
- 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~135 days; expected demand during lead time 0.6.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 32.4M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 11%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 534.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1320D INHIBITOR PUMP | B | 2 | 11 | 4.47 |
Lead time and procurement
Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jul 2026 | Medium | PX_PP-1320D | PP-1320D seal leak |
| 26 Apr 2026 | Low | PX_PP-1320D | PP-1320D abnormal noise |
| 07 Apr 2026 | Medium | PX_PP-1320D | PP-1320D seal leak |
| 02 Mar 2026 | Medium | PX_PP-1320D | PP-1320D seal leak |
| 01 Mar 2026 | Low | PX_PP-1320D | Replace lamp as per PM finding |
| 26 Feb 2026 | Medium | PX_PP-1320D | PP-1320D discharge pressure low |
| 23 Jan 2026 | Medium | PX_PP-1320D | Replace lamp as per PM finding |
| 19 Jan 2026 | Medium | PX_PP-1320D | Oil leak at PP-1320D bearing housing |
| 02 Nov 2025 | Low | PX_PP-1320D | Replace bearing PP-1320D |
| 01 Nov 2025 | Medium | PX_PP-1320D | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Jan 2026 | 1 | 201000013677 | Corrective |