SLEEVE,SHAFT,DWG.796-2907,FOR PP-1320D

Material 4300030789 · SLEEVE · Plant 1000

BReorderNormalSlow-moving
Material
4300030789
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~135 days; expected demand during lead time 0.6.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 32.4M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 11%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 534.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1320D
INHIBITOR PUMP
B2114.47

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jul 2026MediumPX_PP-1320DPP-1320D seal leak
26 Apr 2026LowPX_PP-1320DPP-1320D abnormal noise
07 Apr 2026MediumPX_PP-1320DPP-1320D seal leak
02 Mar 2026MediumPX_PP-1320DPP-1320D seal leak
01 Mar 2026LowPX_PP-1320DReplace lamp as per PM finding
26 Feb 2026MediumPX_PP-1320DPP-1320D discharge pressure low
23 Jan 2026MediumPX_PP-1320DReplace lamp as per PM finding
19 Jan 2026MediumPX_PP-1320DOil leak at PP-1320D bearing housing
02 Nov 2025LowPX_PP-1320DReplace bearing PP-1320D
01 Nov 2025MediumPX_PP-1320DReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000013677Corrective