RING,WEAR,DWG.395-3168,FOR PP-1807C

Material 4300030871 · RING · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300030871
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
97 d · P80 143 d
Unit price
Rp 11.4M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~97 days; expected demand during lead time 0.2.
  • 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 22.9M · order by 01 Oct 2026
Expected arrival ≈ 97 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.9%
stockout risk now 15%
Unit price
Rp 11.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 185.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1807C
C3 RECYCLE PUMP
B161.47

Lead time and procurement

Lead time 97 ± 40 days (PO history + category, 2 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
04 Jan 2026PR05
Project / turnaround
1Rp 11.3M26 May 2026142 d
16 May 2025PR06
Regular replenishment
2Rp 11.5M22 Jul 202567 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 May 2026MediumPX_PP-1807CInstall scaffolding at PP-1807C
24 Jan 2026MediumPX_PP-1807CReplace lamp as per PM finding
07 Nov 2025MediumPX_PP-1807COverhaul PP-1807C
19 Sept 2025MediumPX_PP-1807CInstall scaffolding at PP-1807C
30 Aug 2025MediumPX_PP-1807CPP-1807C abnormal noise
23 May 2025MediumPX_PP-1807CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
03 Dec 20251201000027307Corrective