RING,WEAR,DWG.395-3168,FOR PP-1807C
Material 4300030871 · RING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300030871
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- BERKAH TEKNIK GLOBAL PT
- Lead time
- 97 d · P80 143 d
- Unit price
- Rp 11.4M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~97 days; expected demand during lead time 0.2.
- 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 22.9M · order by 01 Oct 2026
Expected arrival ≈ 97 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.9%
stockout risk now 15%
Unit price
Rp 11.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 302 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 185.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~59 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1807C C3 RECYCLE PUMP | B | 1 | 6 | 1.47 |
Lead time and procurement
Lead time 97 ± 40 days (PO history + category, 2 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Jan 2026 | PR05 Project / turnaround | 1 | Rp 11.3M | 26 May 2026 | 142 d |
| 16 May 2025 | PR06 Regular replenishment | 2 | Rp 11.5M | 22 Jul 2025 | 67 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 May 2026 | Medium | PX_PP-1807C | Install scaffolding at PP-1807C |
| 24 Jan 2026 | Medium | PX_PP-1807C | Replace lamp as per PM finding |
| 07 Nov 2025 | Medium | PX_PP-1807C | Overhaul PP-1807C |
| 19 Sept 2025 | Medium | PX_PP-1807C | Install scaffolding at PP-1807C |
| 30 Aug 2025 | Medium | PX_PP-1807C | PP-1807C abnormal noise |
| 23 May 2025 | Medium | PX_PP-1807C | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Dec 2025 | 1 | 201000027307 | Corrective |