SEAT RING,VALVE,DWG.788-6542,FOR FCV-188
Material 4300030908 · SEAT RING · Plant 1000
BLong-leadReduceNon-moving
- Material
- 4300030908
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- TIRTA SEJAHTERA PERSADA PT
- Lead time
- 93 d · P80 184 d
- Unit price
- Rp 5.2M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~93 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 7 exceeds the level to keep (1) by 6.
- 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.2M
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1886C VD-1416A OUTLET FLOW | B | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 93 ± 58 days (PO history + category, 2 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR06 Regular replenishment | 2 | Rp 5.2M | 29 Jul 2026 | 30 d |
| 10 Oct 2025 | PR06 Regular replenishment | 2 | Rp 5.2M | 24 Jan 2026 | 106 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.