Sparely
DU

THERMOWELL,DWG.235-2769,FOR BF-112-COIL1

Material 4300030971 · THERMOWELL · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4300030971
Category
THERMOWELL
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PRIMA SUPLINDO JAYA PT
Lead time
85 d · P80 140 d
Unit price
Rp 2.3M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~85 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 2.3M · order by 01 Oct 2026
Expected arrival ≈ 85 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.3M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 191 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 352.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~43 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112-COIL19
CONVECTION SECTION
A100.45

Lead time and procurement

Lead time 85 ± 40 days (PO history + category, 1 PO lines) · on-time 32%

PR dateTypeQtyUnit priceDeliveryLead time
15 Dec 2025PR03
Regular replenishment
1Rp 2.3M30 Mar 2026105 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
24 Mar 20261201000018225Corrective