SEAL,LABYRINTH,DWG.271-4634,FOR KC-717
Material 4300031206 · SEAL · Plant 1000
AReduceNon-moving
- Material
- 4300031206
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 0.2 SET/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~150 days; expected demand during lead time 0.1.
- 3.A 93.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 21 exceeds the level to keep (1) by 20.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
93.5%
stockout risk now 0%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 246.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 1 | 9 | 4.00 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Low | PX_KC-717 | Leak from packing |
| 08 Aug 2026 | Medium | PX_KC-717 | Repair insulation KC-717 |
| 20 Jul 2026 | Low | PX_KC-717 | Inspect coupling KC-717 |
| 05 Jul 2026 | Medium | PX_KC-717 | Overhaul |
| 12 Mar 2026 | Low | PX_KC-717 | Replace lamp as per PM finding |
| 01 Mar 2026 | Medium | PX_KC-717 | Leak from packing |
| 15 Nov 2025 | Low | PX_KC-717 | Leak from packing |
| 19 Aug 2025 | Medium | PX_KC-717 | Repair insulation KC-717 |
| 18 May 2025 | Low | PX_KC-717 | Overhaul |
Recent goods issues
Never issued in the 17-month history.