SEAT RING,VALVE,DWG.902-7523,FOR FCV-327

Material 4300031323 · SEAT RING · Plant 1000

CReorderHighStockout
Material
4300031323
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
110 d · P80 184 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~110 days; expected demand during lead time 0.2.
  • 3.A 90.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 22.6M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
90.8%
stockout risk now 9%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 307 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~65 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-327
CONTROL VALVE
C110.54

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jun 2025LowPX_FCV-327FCV-327 stuck

Recent goods issues

Posting dateQtyOrderOrder type
28 Nov 20252201000004723Corrective