SPRING,SAFETY VALVE,DWG.964-9423,FOR PRV

Material 4300031707 · SPRING · Plant 1000

SSafety-criticalLong-leadReduceSlow-moving
Material
4300031707
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
158 d · P80 201 d
Unit price
Rp 3.8M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~158 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 13 exceeds the level to keep (2) by 11.
  • 6.Long lead time: 80% of deliveries took up to 201 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
13 / 3
next delivery 11 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 3.8M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 362 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 240.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PRV-1062A
SAFETY VALVE HE-912
S100.04

Lead time and procurement

Lead time 158 ± 55 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
28 Mar 2026PR06
Regular replenishment
2Rp 3.7M13 Nov 2026
open
230 d
03 Jan 2026PR03
Regular replenishment
1Rp 3.7M10 Jun 2026158 d
08 Nov 2025PR06
Regular replenishment
2Rp 3.9M03 Apr 2026146 d
21 Aug 2025PR01
Import / long-lead
1Rp 3.8M11 Oct 2026
open
416 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
04 Oct 20251201000016100Corrective