SEAL,LABYRINTH,DWG.560-8189,FOR KC-458D
Material 4300032003 · SEAL · Plant 1000
SReducePotentially obsolete
- Material
- 4300032003
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~150 days; expected demand during lead time 0.1.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 5 exceeds the level to keep (0) by 5.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
4 / 9
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 434,297/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-458D SLOP OIL FAN | S | 1 | 9 | 3.14 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 16 Sept 2026 | Low | PX_KC-458D | KC-458D lube oil filter DP high |
| 24 Jun 2026 | Medium | PX_KC-458D | KC-458D bearing temp high |
| 15 Mar 2026 | Medium | PX_KC-458D | Painting KC-458D |
| 27 Dec 2025 | Medium | PX_KC-458D | Install scaffolding at KC-458D |
| 09 Dec 2025 | Medium | PX_KC-458D | Overhaul |
| 24 Nov 2025 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 05 Sept 2025 | Low | PX_KC-458D | Replace lamp as per PM finding |
| 21 May 2025 | Medium | PX_KC-458D | Inspect coupling KC-458D |
Recent goods issues
Never issued in the 17-month history.