BLADE,ROTOR,DWG.287-3013,FOR KT-624A

Material 4300032770 · BLADE · Plant 1000

SReducePotentially obsolete
Material
4300032770
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PERMATA SUPLINDO JAYA PT
Lead time
155 d · P80 263 d
Unit price
Rp 178.3M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~155 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 59 exceeds the level to keep (0) by 59.
Single sourceOpen PO
On hand / on order
59 / 3
next delivery 07 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 178.3M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 404,465/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~99 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 155 ± 109 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR03
Regular replenishment
1Rp 176.2M06 Jan 2027
open
132 d
29 Jun 2026PR06
Regular replenishment
2Rp 180.4M07 Oct 2026
open
100 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line

Recent goods issues

Never issued in the 17-month history.