Sparely
DU

SPRING,SAFETY VALVE,DWG.319-2245,FOR PRV

Material 4300033865 · SPRING · Plant 1000

SSafety-criticalLong-leadReorderCriticalStockout
Material
4300033865
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
130 d · P80 154 d
Unit price
Rp 15.3M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~130 days; expected demand during lead time 0.1.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.On hand 0 + on order 1 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 154 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
5 EA
Rp 76.7M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 30 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 4%
Unit price
Rp 15.3M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 399 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 210.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-852D
SAFETY VALVE PP-296A
S100.04

Lead time and procurement

Lead time 130 ± 59 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
14 Jun 2026PR06
Regular replenishment
1Rp 15.4M30 Nov 2026
open
169 d
05 Feb 2026PR06
Regular replenishment
2Rp 15.3M12 Apr 202666 d
06 Jun 2025PR03
Regular replenishment
1Rp 15.2M15 Oct 2025131 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
28 Aug 20251201000002071Corrective
28 Aug 20252201000002071Corrective