SLEEVE,SHAFT,DWG.872-5428,FOR PP-376A
Material 4300034469 · SLEEVE · Plant 1000
CMonitorStockout
- Material
- 4300034469
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- LANGIT INDUSTRI PRATAMA PT
- Lead time
- 120 d · P80 210 d
- Unit price
- Rp 4.8M
Recommendation
- 1.Forecast 1.3 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~120 days; expected demand during lead time 0.2.
- 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 3.
Convert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 27 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
3
order qty 2
Service level
98.5%
stockout risk now 0%
Unit price
Rp 4.8M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 96 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 15.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-376A QUENCH OIL PUMP | C | 1 | 1 | 0.62 |
Lead time and procurement
Lead time 120 ± 55 days (PO history + category, 2 PO lines) · on-time 53%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Jun 2026 | PR06 Regular replenishment | 2 | Rp 4.7M | 27 Oct 2026 open | 130 d |
| 08 Jan 2026 | PR03 Regular replenishment | 2 | Rp 4.8M | 16 Mar 2026 | 67 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Feb 2027 | PX_PP-376A | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Jun 2025 | Low | PX_PP-376A | PP-376A seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jun 2026 | 1 | 201000031263 | Corrective |