NOZZLE,SAFETY VALVE,DWG.749-8039,FOR PRV
Material 4300034688 · NOZZLE · Plant 1000
BSafety-criticalLong-leadReduceSlow-moving
- Material
- 4300034688
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 108 d · P80 177 d
- Unit price
- Rp 10.8M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~108 days; expected demand during lead time 0.1.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Stock 3 exceeds the level to keep (2) by 1.
- 6.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 10.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 307.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-227 SAFETY VALVE PP-779A | B | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 108 ± 50 days (PO history + category, 1 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jan 2026 | PR06 Regular replenishment | 2 | Rp 10.8M | 10 Apr 2026 | 70 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jan 2026 | 1 | 201000011760 | Corrective |