TRIM SET,CONTROL VALVE,DWG.751-5396,FOR
Material 4300035028 · TRIM SET · Plant 1000
BLong-leadMonitorTAM reserve
- Material
- 4300035028
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- SAMUDRA UTAMA GLOBAL PT
- Lead time
- 161 d · P80 185 d
- Unit price
- Rp 93.9M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~161 days; expected demand during lead time 0.0.
- 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Used only during the last turnaround (4 SET): keep it for the next one instead of treating it as slow-moving.
- 5.Long lead time: 80% of deliveries took up to 185 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadLast turnaround used 4Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.5%
stockout risk now 0%
Unit price
Rp 93.9M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 22.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-879A CONTROL VALVE | B | 2 | 3 | 1.39 |
Lead time and procurement
Lead time 161 ± 72 days (PO history, 5 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Mar 2026 | PR06 Regular replenishment | 1 | Rp 94.9M | 09 Jul 2026 | 113 d |
| 10 Oct 2025 | PR06 Regular replenishment | 2 | Rp 93.9M | 22 Mar 2026 | 163 d |
| 29 Jul 2025 | PR03 Regular replenishment | 2 | Rp 90.8M | 31 Dec 2025 | 155 d |
| 26 May 2025 | PR01 Import / long-lead | 1 | Rp 94.5M | 22 Feb 2026 | 272 d |
| 15 May 2025 | PR06 Regular replenishment | 1 | Rp 92.4M | 02 Sept 2025 | 110 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Sept 2026 | Medium | PX_FCV-879A | FCV-879A; valve hunting |
| 15 Oct 2025 | Medium | PX_FCV-879A | Replace lamp as per PM finding |
| 08 Jun 2025 | Low | PX_FCV-879A | FCV-879A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Nov 2025 | 1 | 203000020131 | Turnaround |
| 22 Nov 2025 | 2 | 203000020131 | Turnaround |
| 22 Nov 2025 | 1 | 203000020131 | Turnaround |