TRIM SET,CONTROL VALVE,DWG.842-2356,FOR

Material 4300035047 · TRIM SET · Plant 1000

BLong-leadReduceSlow-moving
Material
4300035047
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
ANUGRAH TEKNOLOGI INTERNASIONAL PT
Lead time
155 d · P80 236 d
Unit price
Rp 64.4M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~155 days; expected demand during lead time 0.0.
  • 3.A 97.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 4 exceeds the level to keep (2) by 2; the level includes the 2 used in the last turnaround.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadLast turnaround used 2Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.6%
stockout risk now 0%
Unit price
Rp 64.4M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 22.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-879A
CONTROL VALVE
B131.39

Lead time and procurement

Lead time 155 ± 83 days (PO history + category, 1 PO lines) · on-time 23%

PR dateTypeQtyUnit priceDeliveryLead time
18 Jan 2026PR06
Regular replenishment
2Rp 64.4M09 Jun 2026142 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026MediumPX_FCV-879AFCV-879A; valve hunting
15 Oct 2025MediumPX_FCV-879AReplace lamp as per PM finding
08 Jun 2025LowPX_FCV-879AFCV-879A passing

Recent goods issues

Posting dateQtyOrderOrder type
23 Nov 20251203000020131Turnaround
20 Nov 20251203000020131Turnaround