Sparely
DU

TRIM SET,CONTROL VALVE,DWG.274-8443,FOR

Material 4300035187 · TRIM SET · Plant 1000

CReduceNon-moving
Material
4300035187
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
193 d · P80 236 d
Unit price
Rp 47.6M

Recommendation

  • 1.Forecast 0.7 SET/year: 0.0 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~193 days; expected demand during lead time 0.7 (incl. 0.7 planned).
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 29 exceeds the level to keep (0) by 29.
Convert to Non StockSingle sourceOpen POPlanned demand in lead time
On hand / on order
29 / 2
next delivery 01 Mar 2027
Today Min / Max
4 / 13
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 47.6M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 702,326/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1173
TEMPERATURE CONTROL VALVE
C110.55

Lead time and procurement

Lead time 193 ± 83 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
21 Apr 2026PR03
Regular replenishment
2Rp 48.2M01 Mar 2027
open
314 d
22 May 2025PR06
Regular replenishment
1Rp 47.0M14 Nov 2025176 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_TCV-1173Final Element Overhaul; CV0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Jul 2025LowPX_TCV-1173Leak from packing

Recent goods issues

Never issued in the 17-month history.