SEAT RING,VALVE,DWG.244-1380,FOR TCV-122
Material 4300035299 · SEAT RING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300035299
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 112 d · P80 184 d
- Unit price
- Rp 6.1M
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~112 days; expected demand during lead time 0.3.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 12.3M · order by 01 Oct 2026
Expected arrival ≈ 112 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 21 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.6%
stockout risk now 0%
Unit price
Rp 6.1M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 360.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1224 KC-369B TEMP CONTROL | B | 1 | 7 | 2.26 |
Lead time and procurement
Lead time 112 ± 58 days (PO history + category, 1 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Jul 2026 | PR06 Regular replenishment | 2 | Rp 6.1M | 21 Nov 2026 open | 118 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Low | PX_TCV-1224 | Install scaffolding at TCV-1224 |
| 23 Jul 2026 | Medium | PX_TCV-1224 | TCV-1224 passing |
| 25 Jun 2026 | Medium | PX_TCV-1224 | TCV-1224; IA leak from regulator |
| 18 May 2026 | Medium | PX_TCV-1224 | TCV-1224; small leak at packing |
| 25 Dec 2025 | Medium | PX_TCV-1224 | Replace lamp as per PM finding |
| 25 Aug 2025 | Low | PX_TCV-1224 | Overhaul TCV-1224 |
| 02 May 2025 | High | PX_TCV-1224 | Overhaul TCV-1224 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jul 2026 | 1 | 201000004880 | Corrective |