TRIM SET,CONTROL VALVE,DWG.448-3595,FOR
Material 4300035320 · TRIM SET · Plant 1000
BReduceNon-moving
- Material
- 4300035320
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~159 days; expected demand during lead time 0.0.
- 3.A 96.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 405 exceeds the level to keep (1) by 404.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
405 / 0
no open PO
Today Min / Max
5 / 13
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
96.0%
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 36.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1224 KC-369B TEMP CONTROL | B | 1 | 7 | 2.26 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Low | PX_TCV-1224 | Install scaffolding at TCV-1224 |
| 23 Jul 2026 | Medium | PX_TCV-1224 | TCV-1224 passing |
| 25 Jun 2026 | Medium | PX_TCV-1224 | TCV-1224; IA leak from regulator |
| 18 May 2026 | Medium | PX_TCV-1224 | TCV-1224; small leak at packing |
| 25 Dec 2025 | Medium | PX_TCV-1224 | Replace lamp as per PM finding |
| 25 Aug 2025 | Low | PX_TCV-1224 | Overhaul TCV-1224 |
| 02 May 2025 | High | PX_TCV-1224 | Overhaul TCV-1224 |
Recent goods issues
Never issued in the 17-month history.