SLEEVE,SHAFT,DWG.428-5111,FOR PP-1216C

Material 4300035412 · SLEEVE · Plant 1000

BLong-leadReduceNon-moving
Material
4300035412
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
MITRA SARANA INTERNASIONAL PT
Lead time
132 d · P80 210 d
Unit price
Rp 3.5M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~132 days; expected demand during lead time 0.0.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 2 exceeds the level to keep (1) by 1.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 3.5M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1216C
FLUSHING OIL PUMP
B100.19

Lead time and procurement

Lead time 132 ± 55 days (PO history + category, 1 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
23 Aug 2025PR06
Regular replenishment
1Rp 3.5M22 Dec 2025121 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.