Sparely
DU

SPRING,SAFETY VALVE,DWG.607-3596,FOR PRV

Material 4300035499 · SPRING · Plant 1000

CSafety-criticalMonitorStockout
Material
4300035499
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
107 d · P80 86 d
Unit price
Rp 5.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~107 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
Safety-critical (SCE)Single sourceOpen PO
On hand / on order
0 / 2
next delivery 31 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 5.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 280 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 322.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1360B
SAFETY VALVE PP-1171
C100.04

Lead time and procurement

Lead time 107 ± 41 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
11 Aug 2026PR03
Regular replenishment
2Rp 5.4M31 Oct 2026
open
81 d
11 Jan 2026PR03
Regular replenishment
2Rp 5.4M11 Apr 202690 d
16 Jul 2025PR03
Regular replenishment
1Rp 5.6M13 Sept 202559 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
25 Dec 20251201000011308Corrective