BEARING,JOURNAL,DWG.777-8151,FOR KC-422A
Material 4300035665 · BEARING · Plant 1000
SReduceSlow-moving
- Material
- 4300035665
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- ATLAS TURBO SERVICES INC
- Lead time
- 139 d · P80 127 d
- Unit price
- Rp 92.7M
Recommendation
- 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~139 days; expected demand during lead time 0.4.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 1 exceeds the level to keep (0) by 1.
Single sourceOpen PO
On hand / on order
1 / 2
next delivery 04 Apr 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 92.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-422A C4 PRODUCT BLOWER | S | 1 | 6 | 2.71 |
Lead time and procurement
Lead time 139 ± 40 days (PO history + category, 2 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Apr 2026 | PR05 Project / turnaround | 2 | Rp 91.7M | 04 Apr 2027 open | 350 d |
| 17 Aug 2025 | PR06 Regular replenishment | 1 | Rp 93.7M | 12 Feb 2026 | 179 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Jul 2026 | Medium | PX_KC-422A | KC-422A high vibration |
| 03 Mar 2026 | Low | PX_KC-422A | Leak from packing |
| 20 Jan 2026 | Low | PX_KC-422A | Leak from packing |
| 24 Nov 2025 | Low | PX_KC-422A | KC-422A lube oil filter DP high |
| 19 Oct 2025 | Medium | PX_KC-422A | KC-422A high vibration |
| 23 May 2025 | Low | PX_KC-422A | Overhaul |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jan 2026 | 1 | 201000005143 | Corrective |