TRIM SET,CONTROL VALVE,DWG.732-3271,FOR
Material 4300035790 · TRIM SET · Plant 1000
CMonitorNo stock needed
- Material
- 4300035790
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- TIRTA SEJAHTERA PERSADA PT
- Lead time
- 207 d · P80 300 d
- Unit price
- Rp 66.2M
Recommendation
- 1.Forecast 1.5 SET/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~207 days; expected demand during lead time 0.8.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle sourceOpen PO
On hand / on order
0 / 5
next delivery 19 Nov 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 66.2M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 276 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-865 PP-1685 LEVEL CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 207 ± 82 days (PO history, 3 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Jun 2026 | PR04 Regular (other) | 1 | Rp 67.5M | 10 Feb 2027 open | 236 d |
| 18 May 2026 | PR03 Regular replenishment | 3 | Rp 64.4M | 19 Nov 2026 open | 185 d |
| 27 Mar 2026 | PR06 Regular replenishment | 1 | Rp 66.2M | 05 Mar 2027 open | 343 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Dec 2025 | 1 | 201000020183 | Corrective |
| 28 Dec 2025 | 3 | 201000020183 | Corrective |
| 28 Dec 2025 | 1 | 201000020183 | Corrective |