POSITIONER,VALVE,DWG.543-1134,FOR TCV-38
Material 4300036071 · POSITIONER · Plant 1000
CReduceSlow-moving
- Material
- 4300036071
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- KARYA SARANA GLOBAL PT
- Lead time
- 93 d · P80 166 d
- Unit price
- Rp 49.5M
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~93 days; expected demand during lead time 0.2.
- 3.A 81.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
Single sourceOpen PO
On hand / on order
2 / 2
next delivery 13 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
81.6%
stockout risk now 0%
Unit price
Rp 49.5M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 333 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-385 TEMPERATURE CONTROL VALVE | C | 1 | 6 | 2.26 |
Lead time and procurement
Lead time 93 ± 64 days (PO history + category, 1 PO lines) · on-time 18%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Jul 2026 | PR03 Regular replenishment | 2 | Rp 49.5M | 13 Oct 2026 open | 87 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Jun 2026 | Medium | PX_TCV-385 | TCV-385 passing |
| 06 Feb 2026 | Medium | PX_TCV-385 | TCV-385; valve hunting |
| 05 Dec 2025 | Low | PX_TCV-385 | TCV-385 passing |
| 03 Nov 2025 | Medium | PX_TCV-385 | TCV-385; IA leak from regulator |
| 15 Oct 2025 | Medium | PX_TCV-385 | Replace lamp as per PM finding |
| 27 May 2025 | High | PX_TCV-385 | TCV-385; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Nov 2025 | 1 | 201000025438 | Corrective |