TRIM SET,CONTROL VALVE,DWG.607-5278,FOR

Material 4300036355 · TRIM SET · Plant 1000

ALong-leadMonitorInsurance gap
Material
4300036355
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PACIFIC INSTRUMENTS PTE LTD
Lead time
135 d · P80 236 d
Unit price
Rp 60.3M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~135 days; expected demand during lead time 0.0.
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.6%
stockout risk now 1%
Unit price
Rp 60.3M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 60.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-750
BY PASS DUCT
A120.94

Lead time and procurement

Lead time 135 ± 83 days (PO history + category, 2 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
14 Apr 2026PR03
Regular replenishment
2Rp 60.1M10 Aug 2026118 d
14 Nov 2025PR03
Regular replenishment
2Rp 60.4M02 Feb 202680 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Apr 2026MediumPX_PCV-750PCV-750; small leak at packing
05 Jun 2025HighPX_PCV-750Overhaul PCV-750

Recent goods issues

Never issued in the 17-month history.