TRIM SET,CONTROL VALVE,DWG.118-9476,FOR
Material 4300036414 · TRIM SET · Plant 1000
ALong-leadMonitorStockout
- Material
- 4300036414
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 163 d · P80 236 d
- Unit price
- Rp 114.1M
Recommendation
- 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~163 days; expected demand during lead time 0.3.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 3
next delivery 07 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 114.1M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 963.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-621 PP-902B OUTLET FLOW | A | 1 | 4 | 1.39 |
Lead time and procurement
Lead time 163 ± 83 days (PO history + category, 1 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Jul 2026 | PR05 Project / turnaround | 1 | Rp 115.8M | 19 Mar 2028 open | 608 d |
| 15 Apr 2026 | PR01 Import / long-lead | 2 | Rp 112.4M | 07 Oct 2026 open | 175 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Jun 2026 | Medium | PX_FCV-621 | Install scaffolding at FCV-621 |
| 22 Jan 2026 | Medium | PX_FCV-621 | Leak from packing |
| 24 Sept 2025 | Low | PX_FCV-621 | Replace lamp as per PM finding |
| 18 Jul 2025 | High | PX_FCV-621 | FCV-621 stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Jan 2026 | 1 | 201000033025 | Corrective |