RING,WEAR,DWG.377-5729,FOR PP-1157
Material 4300036717 · RING · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4300036717
- Category
- RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- LANGIT INDUSTRI PRATAMA PT
- Lead time
- 106 d · P80 143 d
- Unit price
- Rp 3.3M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~106 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 396 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 54.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~59 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1157 ETHYLENE PUMP | B | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 106 ± 40 days (PO history + category, 2 PO lines) · on-time 53%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR03 Regular replenishment | 2 | Rp 3.3M | 30 Sept 2026 | 93 d |
| 03 Apr 2026 | PR06 Regular replenishment | 1 | Rp 3.4M | 10 Sept 2026 | 160 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 May 2025 | Medium | PX_PP-1157 | Overhaul PP-1157 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Aug 2025 | 1 | 201000023178 | Corrective |