Sparely
DU

RING,WEAR,DWG.377-5729,FOR PP-1157

Material 4300036717 · RING · Plant 1000

BLong-leadReduceSlow-moving
Material
4300036717
Category
RING
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
LANGIT INDUSTRI PRATAMA PT
Lead time
106 d · P80 143 d
Unit price
Rp 3.3M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~106 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 4 exceeds the level to keep (2) by 2.
  • 5.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 59 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 396 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 54.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~59 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1157
ETHYLENE PUMP
B110.19

Lead time and procurement

Lead time 106 ± 40 days (PO history + category, 2 PO lines) · on-time 53%

PR dateTypeQtyUnit priceDeliveryLead time
29 Jun 2026PR03
Regular replenishment
2Rp 3.3M30 Sept 202693 d
03 Apr 2026PR06
Regular replenishment
1Rp 3.4M10 Sept 2026160 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 May 2025MediumPX_PP-1157Overhaul PP-1157

Recent goods issues

Posting dateQtyOrderOrder type
31 Aug 20251201000023178Corrective