IMPELLER,DWG.352-6394,FOR PP-1748

Material 4300036804 · IMPELLER · Plant 1000

BLong-leadMonitorStockout
Material
4300036804
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
215 d · P80 276 d
Unit price
Rp 104.7M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~215 days; expected demand during lead time 0.3.
  • 3.A 87.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 01 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
87.3%
stockout risk now 13%
Unit price
Rp 104.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 293 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 128.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1748
REFLUX PUMP
B100.19

Lead time and procurement

Lead time 215 ± 88 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
27 Apr 2026PR06
Regular replenishment
1Rp 104.7M01 Mar 2027
open
308 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
12 Dec 20252201000003206Corrective