SEAT RING,VALVE,DWG.622-8214,FOR LCV-104

Material 4300037117 · SEAT RING · Plant 1000

CReduceSlow-moving
Material
4300037117
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
164 d · P80 255 d
Unit price
Rp 7.2M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~164 days; expected demand during lead time 0.2.
  • 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 11 exceeds the level to keep (9) by 2; the level includes the 9 used in the last turnaround.
Last turnaround used 9Single sourceOpen PO
On hand / on order
11 / 14
next delivery 26 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.1%
stockout risk now 0%
Unit price
Rp 7.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 339 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (9 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~65 days.

Installed on 1 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1043B
VD-587 LEVEL CONTROL
C200.12

Lead time and procurement

Lead time 164 ± 77 days (PO history, 9 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
28 Jul 2026PR06
Regular replenishment
3Rp 7.1M16 Nov 2026
open
111 d
24 Jun 2026PR03
Regular replenishment
4Rp 7.5M28 Jan 2027
open
218 d
04 Jun 2026PR01
Import / long-lead
4Rp 7.2M03 Mar 2027
open
272 d
21 Feb 2026PR06
Regular replenishment
8Rp 7.2M22 Apr 202660 d
03 Jan 2026PR05
Project / turnaround
3Rp 7.1M26 Oct 2026
open
296 d
17 Dec 2025PR06
Regular replenishment
2Rp 7.4M18 Aug 2026244 d
07 Dec 2025PR03
Regular replenishment
7Rp 7.1M26 Mar 2026109 d
25 Jun 2025PR05
Project / turnaround
7Rp 7.4M18 Jan 2026207 d
27 May 2025PR06
Regular replenishment
8Rp 7.5M24 Sept 2025120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
11 Nov 20251203000039046Turnaround
10 Nov 20251203000039046Turnaround
09 Nov 20251203000039046Turnaround
08 Nov 20251203000039046Turnaround
08 Nov 20254203000039046Turnaround
07 Nov 20251203000039046Turnaround
27 Oct 20251201000020408Corrective
26 Oct 20251201000020408Corrective