SEAT RING,VALVE,DWG.622-8214,FOR LCV-104
Material 4300037117 · SEAT RING · Plant 1000
CReduceSlow-moving
- Material
- 4300037117
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 164 d · P80 255 d
- Unit price
- Rp 7.2M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~164 days; expected demand during lead time 0.2.
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 11 exceeds the level to keep (9) by 2; the level includes the 9 used in the last turnaround.
Last turnaround used 9Single sourceOpen PO
On hand / on order
11 / 14
next delivery 26 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.1%
stockout risk now 0%
Unit price
Rp 7.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 339 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (9 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~65 days.
Installed on 1 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1043B VD-587 LEVEL CONTROL | C | 2 | 0 | 0.12 |
Lead time and procurement
Lead time 164 ± 77 days (PO history, 9 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Jul 2026 | PR06 Regular replenishment | 3 | Rp 7.1M | 16 Nov 2026 open | 111 d |
| 24 Jun 2026 | PR03 Regular replenishment | 4 | Rp 7.5M | 28 Jan 2027 open | 218 d |
| 04 Jun 2026 | PR01 Import / long-lead | 4 | Rp 7.2M | 03 Mar 2027 open | 272 d |
| 21 Feb 2026 | PR06 Regular replenishment | 8 | Rp 7.2M | 22 Apr 2026 | 60 d |
| 03 Jan 2026 | PR05 Project / turnaround | 3 | Rp 7.1M | 26 Oct 2026 open | 296 d |
| 17 Dec 2025 | PR06 Regular replenishment | 2 | Rp 7.4M | 18 Aug 2026 | 244 d |
| 07 Dec 2025 | PR03 Regular replenishment | 7 | Rp 7.1M | 26 Mar 2026 | 109 d |
| 25 Jun 2025 | PR05 Project / turnaround | 7 | Rp 7.4M | 18 Jan 2026 | 207 d |
| 27 May 2025 | PR06 Regular replenishment | 8 | Rp 7.5M | 24 Sept 2025 | 120 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Nov 2025 | 1 | 203000039046 | Turnaround |
| 10 Nov 2025 | 1 | 203000039046 | Turnaround |
| 09 Nov 2025 | 1 | 203000039046 | Turnaround |
| 08 Nov 2025 | 1 | 203000039046 | Turnaround |
| 08 Nov 2025 | 4 | 203000039046 | Turnaround |
| 07 Nov 2025 | 1 | 203000039046 | Turnaround |
| 27 Oct 2025 | 1 | 201000020408 | Corrective |
| 26 Oct 2025 | 1 | 201000020408 | Corrective |