Sparely
DU

DISC,SAFETY VALVE,DWG.751-7084,FOR PRV-1

Material 4300037347 · DISC · Plant 1000

SSafety-criticalReduceNon-moving
Material
4300037347
Category
DISC
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 171 d
Unit price
Rp 12.5M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~88 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.Stock 44 exceeds the level to keep (1) by 43.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
44 / 0
no open PO
Today Min / Max
10 / 25
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 12.5M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1661B
SAFETY VALVE KC-426D
S100.04

Lead time and procurement

Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.