Sparely
DU

IMPELLER,DWG.461-5488,FOR PP-500

Material 4300037432 · IMPELLER · Plant 1000

ALong-leadReduceNon-moving
Material
4300037432
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI PERKASA JAYA PT
Lead time
155 d · P80 276 d
Unit price
Rp 51.0M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~155 days; expected demand during lead time 0.0.
  • 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 2 exceeds the level to keep (1) by 1.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 05 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 51.0M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-500
GASOLINE PUMP
A131.05

Lead time and procurement

Lead time 155 ± 88 days (PO history + category, 1 PO lines) · on-time 15%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR06
Regular replenishment
2Rp 51.0M05 Nov 2026
open
66 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Apr 2026LowPX_PP-500Replace bearing PP-500
16 Nov 2025MediumPX_PP-500PP-500 seal leak
20 May 2025HighPX_PP-500[MSI-B-25-RYD-171/M] Replace line

Recent goods issues

Never issued in the 17-month history.