SEAT RING,VALVE,DWG.670-6373,FOR PCV-186

Material 4300037563 · SEAT RING · Plant 1000

SReduceSlow-moving
Material
4300037563
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
LANGIT TEKNOLOGI PERSADA PT
Lead time
119 d · P80 184 d
Unit price
Rp 54.6M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~119 days; expected demand during lead time 0.2.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 3 exceeds the level to keep (0) by 3.
Single sourceOpen PO
On hand / on order
3 / 1
next delivery 02 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 54.6M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 248 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 748,598/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~65 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1868A
PRESSURE CONTROL VALVE
S400.08

Lead time and procurement

Lead time 119 ± 58 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
24 May 2026PR04
Regular (other)
1Rp 55.9M02 Dec 2026
open
192 d
27 Aug 2025PR06
Regular replenishment
1Rp 53.3M10 Nov 202575 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
26 Jan 20262201000037638Corrective