SEAT RING,VALVE,DWG.670-6373,FOR PCV-186
Material 4300037563 · SEAT RING · Plant 1000
SReduceSlow-moving
- Material
- 4300037563
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- LANGIT TEKNOLOGI PERSADA PT
- Lead time
- 119 d · P80 184 d
- Unit price
- Rp 54.6M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~119 days; expected demand during lead time 0.2.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 3 exceeds the level to keep (0) by 3.
Single sourceOpen PO
On hand / on order
3 / 1
next delivery 02 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 54.6M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 248 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 748,598/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~65 days.
Installed on 1 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1868A PRESSURE CONTROL VALVE | S | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 119 ± 58 days (PO history + category, 2 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 May 2026 | PR04 Regular (other) | 1 | Rp 55.9M | 02 Dec 2026 open | 192 d |
| 27 Aug 2025 | PR06 Regular replenishment | 1 | Rp 53.3M | 10 Nov 2025 | 75 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jan 2026 | 2 | 201000037638 | Corrective |