Sparely
DU

SLEEVE,SHAFT,DWG.623-7921,FOR PP-1213

Material 4300037702 · SLEEVE · Plant 1000

CReduceNon-moving
Material
4300037702
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 3.0 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~135 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 25 exceeds the level to keep (0) by 25.
Price estimatedLead time estimated
On hand / on order
25 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1213
FLUSHING OIL PUMP
C472.76

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 May 2027PX_PP-1213Pump overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2026MediumPX_PP-1213Oil leak at PP-1213 bearing housing
12 Jul 2026MediumPX_PP-1213PP-1213 discharge pressure low
05 Jun 2026EmergencyPX_PP-1213Replace bearing PP-1213
28 Feb 2026MediumPX_PP-1213Leak from packing
19 Jan 2026MediumPX_PP-1213[MSI-B-26-RUW-139] Permanent repair
24 Nov 2025EmergencyPX_PP-1213Oil leak at PP-1213 bearing housing
08 May 2025MediumPX_PP-1213Overhaul PP-1213

Recent goods issues

Never issued in the 17-month history.