Sparely
DU

TRIM SET,CONTROL VALVE,DWG.508-2741,FOR

Material 4300037764 · TRIM SET · Plant 1000

BLong-leadMonitorStockout
Material
4300037764
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
177 d · P80 260 d
Unit price
Rp 32.0M

Recommendation

  • 1.Forecast 1.3 SET/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~177 days; expected demand during lead time 0.6.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.Long lead time: 80% of deliveries took up to 260 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 4
next delivery 04 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.1%
stockout risk now 1%
Unit price
Rp 32.0M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 93 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 339.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1963
COOLING WATER FLOW CONTROL
B100.11

Lead time and procurement

Lead time 177 ± 96 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
19 Jul 2026PR05
Project / turnaround
2Rp 32.0M24 Feb 2027
open
220 d
20 Feb 2026PR05
Project / turnaround
2Rp 33.0M04 Dec 2026
open
287 d
24 Jan 2026PR04
Regular (other)
2Rp 31.2M09 Apr 202675 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20261201000014112Corrective
07 Dec 20252201000039778Corrective