POSITIONER,VALVE,DWG.159-8640,FOR PCV-15

Material 4300037778 · POSITIONER · Plant 1000

AReorderCriticalStockout
Material
4300037778
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.1.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 79.8M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 8%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 322 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 259.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1543
HE-1524B PRESSURE CONTROL
A120.51

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
31 Oct 2025HighPX_PCV-1543PCV-1543 passing
10 May 2025LowPX_PCV-1543PCV-1543; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
13 Nov 20251201000001935Corrective