RING,WEAR,DWG.104-3517,FOR PP-942D
Material 4300037827 · RING · Plant 1000
CReorderHighStockout
- Material
- 4300037827
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 95 d · P80 143 d
- Unit price
- Rp 2.9M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~95 days; expected demand during lead time 0.1.
- 3.A 92.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 5.7M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
92.8%
stockout risk now 7%
Unit price
Rp 2.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 418 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-942D RECYCLE ETHANE PUMP | C | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 95 ± 40 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 Dec 2025 | PR06 Regular replenishment | 1 | Rp 2.9M | 15 Apr 2026 | 105 d |
| 20 Aug 2025 | PR03 Regular replenishment | 1 | Rp 2.9M | 24 Nov 2025 | 96 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Jun 2026 | Medium | PX_PP-942D | PP-942D high vibration |
| 09 Aug 2025 | Medium | PX_PP-942D | Install scaffolding at PP-942D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Aug 2025 | 2 | 201000020751 | Corrective |