RING,WEAR,DWG.104-3517,FOR PP-942D

Material 4300037827 · RING · Plant 1000

CReorderHighStockout
Material
4300037827
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
95 d · P80 143 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.1.
  • 3.A 92.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 5.7M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
92.8%
stockout risk now 7%
Unit price
Rp 2.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 418 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~59 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-942D
RECYCLE ETHANE PUMP
C120.62

Lead time and procurement

Lead time 95 ± 40 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
31 Dec 2025PR06
Regular replenishment
1Rp 2.9M15 Apr 2026105 d
20 Aug 2025PR03
Regular replenishment
1Rp 2.9M24 Nov 202596 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Jun 2026MediumPX_PP-942DPP-942D high vibration
09 Aug 2025MediumPX_PP-942DInstall scaffolding at PP-942D

Recent goods issues

Posting dateQtyOrderOrder type
09 Aug 20252201000020751Corrective